Projects

The steel you see on this page is already standing somewhere.

Four projects we would put in front of anyone, then the record behind them — floor areas, and the five buildings already shipped overseas.

120projects delivered in the last three years
75,000 m²largest single industrial park
5,100 tsteel in the Olympic Sports Center
19,800 m²built overseas, five buildings
Four to look at

Where the Tolerance Actually Had to Hold

Each of these had a reason to be difficult. That is why they are here.

Cold-chain logistics base, Shijiazhuang
Cold chain

National backbone cold-chain base, Shijiazhuang

450,000 m² planned on 995 mu. Components broken down in BIM, assembled as modules, with a PV roof over the storage blocks. Phases one and two come online in sequence, so the frame had to be detailed for a building that keeps growing.

995 mu · 450,000 m² planned · BIM breakdown
Read the case →
Shijiazhuang Olympic Sports Center
Long span

Olympic Sports Center, Shijiazhuang

A 360,000 m² complex carrying 5,100 t of steel, with a sliding roof whose largest unit runs past 2,000 m². Movement of that size is a detailing problem before it is a fabrication one.

5,100 t · sliding roof > 2,000 m² · China Steel Structure Gold Award
Read the case →
JD warehousing park, Hebei
Logistics

JD warehousing park, Hebei

300,000 m² of warehouse on 18,000 t of steel, handling 500,000 parcels a day. Docks, ramps and door counts set the building before span did, and the roof had to stay clear for the conveyor.

300,000 m² · 18,000 t · Hebei demonstration project
Read the case →
Factory buildings, Burkina Faso
Export

Factory buildings, Burkina Faso

Three buildings, 6,800 m², fabricated and shipped from Jinzhou as a pre-engineered frame and envelope. Everything was bundled to the erection sequence, because there is no second delivery once the container has sailed.

6,800 m² · 3 buildings · shipped from Jinzhou
Read the case →
Livestock farm sheds, China
Agriculture

Livestock farm sheds, China

Portal-frame houses repeated across a compound, feed silos at the gable ends, roof vents and a fenced yard. Built as one programme rather than one building, which is where the cost sits.

Light-steel villa show units
Housing

Light-steel villa show units, China

European and traditional styles in light-gauge steel, with a heavy-steel frame option. Show units, so the construction can be walked through rather than drawn.

The record

Twenty-Seven Projects, All Delivered

Straight from the project register. Client names are the clients' own; contract values are not shown.

Inner Mongolia Automotive Industrial Park75,000 m²
300,000 t steel structure production line55,368 m²
Shijiazhuang Qiaoxi Automotive Industrial Park37,632 m²
Hebei Bolunte Pharmaceutical29,800 m²
Hebei Ruihe Fuel27,648 m²
Production workshop, Raoyang County23,445 m²
Hebei Hongze Plastics, Workshop 322,989 m²
Tianjin Zhuoyue Fire Technology18,520 m²
Jinkaiwang printing, dyeing and weaving workshop18,350 m²
Gaocheng Hongsen smelting workshop18,240 m²
Zhengding No.9 Middle School teaching building18,050 m²
Hebei Shangtai Technology, Phase I17,680 m²
Olympic Sports Center, phases I and II16,830 m²
Hebei Dingli Food16,490 m²
Ruoyu solid-waste recycling R&D project15,890 m²
Hebei Kaimaoxing Cellulose15,000 m²
Hebei Taili Electric Machinery14,952 m²
Shijiazhuang Lisheng Printing & Dyeing14,886 m²
Gaocheng Hongyang cotton mill14,762 m²
Xiong'an New Area scenic observation deck14,540 m²
Juteng Furniture Industrial Park13,490 m²
Hebei Ante R&D building13,020 m²
Shijiazhuang Yuehua packaging workshop12,500 m²
Huanghua Pharmaceutical Factory12,140.7 m²
Tongchuang Railway School12,000 m²
Hebei Fulaikang renewable resources11,826 m²
Provincial grain reserve warehouse, Jinzhou11,130 m²
Two further projects are recorded by steel tonnage rather than floor area: Hebei Fudun Graphene New Materials, 2,700 t; Hebei Medical College, 1,300 t.
By sector

Four Sectors, Four Different Buildings

The frame is the same trade. What the building has to hold, keep out or move is not.

Shipped out

Two Countries So Far

Structural members and cladding, detailed in Jinzhou, fabricated here, and shipped as a kit that goes up without a second delivery.

01

Burkina Faso

Factory buildings — pre-engineered frames and envelope for a waste treatment works and a logistics warehouse. Three buildings, 6,800 m².

West Africa
02

Brazil

Steel building supply — structural members and cladding for two food factory workshops, 100 m and 40 m spans. 13,000 m².

South America

Send Us a Drawing. We Will Tell You What We Would Change.

No price, no obligation — an engineer reads your plan and tells you where the cost and the trouble usually sit.

Upload drawings