Projects 01 of 04 · Industrial and manufacturing

Eighteen factories, and not one of them the same shape.

From a 75,000 m² automotive park to a single packaging workshop. What changes between them is the crane, the process and the floor — and the frame follows, not the other way round.

18manufacturing projects in the register
75,000 m²largest single industrial park
55,368 m²our own production-line building
5Tekla detailers on every drawing set
What a factory asks for

Five Things the Frame Has to Answer To

A workshop is not a box with a roof. It is a frame that has already agreed with a process — and the process usually wins.

01

The crane

Duty class, hook height, runway length and the wheel loads they produce. Two sheds of the same area with different cranes are not the same building, and the column decides which one you get.

02

The process load

Mezzanines, suspended plant, vibrating equipment, tanks sitting on a steel floor. Every one is a point load that has to be in the model before the frame is sized.

03

The floor

Slab thickness, joints, drainage falls, and the flatness a forklift or a racking system actually needs. The steel frame sets the columns; the floor sets whether the building works.

04

The next phase

Most factories we build are one phase of three. A bolted joint that can take another bay later costs nothing now, and saves a rebuild in five years.

05

The services

Sprinkler mains, ducting, cable trays, compressed air, dust extraction. They hang from the same purlins as the roof, and they are the first thing to collide with a brace.

Before we size it

Six Questions We Ask Before Drawing a Factory

None of them is about steel. All of them decide how much steel the building needs.

01

What runs on the floor

Machines, lines, furnaces, presses. Weight per square metre is the first number that changes everything else.

02

What hangs from the roof

A suspended conveyor, an air-handling unit or a monorail turns a roof into a loaded structure. It has to be declared, not discovered.

03

How goods come in and go out

Docks, ramps, door widths, turning circles for a 12 m trailer. The traffic decides the layout before the span does.

04

Where a column must not stand

One column in the wrong place stops a line. Tell us the aisle and the clearance, and the span follows from it.

05

What phase two adds

Another bay, another crane, another floor. Reserved capacity is cheap; a rebuild is not.

06

How the roof will be maintained

Walkways, fall protection, and a safe route to the plant on the roof. Designed in, it is a detail; added later, it is a cost.

The register

Eighteen Workshops, Delivered

Client names are the clients’ own. Areas are floor area; contract values are not shown.

Inner Mongolia Automotive Industrial Park75,000 m²
300,000 t steel structure production line55,368 m²
Shijiazhuang Qiaoxi Automotive Industrial Park37,632 m²
Hebei Bolunte Pharmaceutical29,800 m²
Production workshop, Raoyang County23,445 m²
Hebei Hongze Plastics, Workshop 322,989 m²
Tianjin Zhuoyue Fire Technology18,520 m²
Jinkaiwang printing, dyeing and weaving18,350 m²
Gaocheng Hongsen smelting workshop18,240 m²
Hebei Shangtai Technology, Phase I17,680 m²
Hebei Kaimaoxing Cellulose15,000 m²
Hebei Taili Electric Machinery14,952 m²
Shijiazhuang Lisheng Printing & Dyeing14,886 m²
Gaocheng Hongyang cotton mill14,762 m²
Juteng Furniture Industrial Park13,490 m²
Hebei Ante R&D building13,020 m²
Shijiazhuang Yuehua packaging workshop12,500 m²
Huanghua Pharmaceutical Factory12,140.7 m²
The full register on the projects page also covers warehousing, education, sport and recycling projects, which are grouped on their own pages.
The other three

Other Sectors

Send the Process Layout. We Will Say Where the Columns Have to Be.

A layout, a crane duty and the site is enough for a first structural answer — and for telling you which of your assumptions costs the most.